基于i‑C&CG算法的风光蓄自适应两阶段鲁棒优化调度方法
CSTR:
作者:
作者单位:

(1.东南大学电气工程学院,江苏 南京 210018;2.中国电力科学研究院有限公司,北京 100192;3.国家电网有限公司,北京 100031)

作者简介:

通讯作者:

楼冠男(1986—),女,博士,副教授,主要研究方向为分布式新能源接入配网运行、储能协同控制与优化;E?mail:glou@seu.edu.cn

中图分类号:

TM762

基金项目:

国家电网有限公司科技项目(4000?202255061A?1?1?ZN).


Adaptive two‑stage robust optimization scheduling method for wind and solar power storage based on i‑C&CG algorithm
Author:
Affiliation:

(1. School of Electrical Engineering,Southeast University,Nanjing 210018,China;2.China Electric Power Research Institute,Beijing 100192,China;3.State Grid Corporation of China,Beijing 100031,China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    随着风光等新能源大规模并网,电力系统中弃风弃光、电压越限和功率倒送等问题日益突出。抽水蓄能作为目前最成熟、最经济的大型储能模式,与新能源联合运行有助于平抑新能源波动性,并提高系统运行灵活性和电力供应可靠性。针对常规风光蓄调控方法对于风光出力不确定等复杂场景求解效率缓慢且求解时间缺乏可调性问题,提出一种基于非精确列和约束生成算法的风光蓄自适应两阶段鲁棒调度方法。首先,建立考虑抽水蓄能机组工况转换和功率过渡的模型;其次,建立了基于多面体区间不确定集的风光蓄两阶段自适应鲁棒调度模型;然后,将模型分解为主?子问题,并通过非精确列和约束生成算法,获得兼顾精度和效率的优化决策。最后,通过算例仿真对比分析了采用非精确列和约束生成算法和传统列和约束生成算法方法的模型求解时间和误差,说明所提出的两阶段调度方法能有效平衡系统运行的鲁棒性和经济性,并在误差允许范围内保证模型求解效率。

    Abstract:

    As the integration of renewable energy such as wind and solar power greatly increases, the challenges such as wind and solar power curtailment, voltage out-of-limit, and reverse power flow are becoming increasingly prominent in power systems. Pumped storage stands out as the most mature and cost-effective large-scale energy storage solution, which can be combined with renewable energy to help mitigate the fluctuation of renewable energy, improve the system operation flexibility, and enhance the reliability of power supply. The conventional wind-solar power storage and control methods have low efficiency in solving complex scenarios such as uncertain wind and solar power output, and the solving time is not adjustable. To address these issues, an adaptive two-stage robust scheduling method for wind-solar power storage based on an inexact column-and-constraint generation (i?C&CG) algorithm is proposed. Firstly, a model considering the operating condition conversion and power transition of pumped storage units is established. Secondly, an adaptive two-stage robust scheduling model for wind-solar power storage is developed based on polyhedral interval uncertain sets. Subsequently, the model is decomposed into master and sub-problems, and the i?C&CG algorithm is employed to derive the optimization decisions that balance the accuracy and efficiency. Finally, through case simulation, the comparison and analysis of the model solving time and error using the i?C&CG algorithm and the traditional column-and-constraint generation algorithm are conducted. It is demonstrated that the proposed two-stage scheduling method can effectively balance the robustness and economy of system operation and ensure the model solving efficiency within the allowable error range.

    参考文献
    相似文献
    引证文献
引用本文

陈亚龙,楼冠男,姬联涛,等.基于i‑C&CG算法的风光蓄自适应两阶段鲁棒优化调度方法[J].电力科学与技术学报,2025,40(3):141-153,173.
CHEN Yalong, LOU Guannan, JI Liantao, et al. Adaptive two‑stage robust optimization scheduling method for wind and solar power storage based on i‑C&CG algorithm[J]. Journal of Electric Power Science and Technology,2025,40(3):141-153,173.