Phase selection capacity recovery strategy for full -scale new energy grid based on coordinated control and protection
Author:
Affiliation:

(1. Electric Power Research Institute , State Grid Chongqing Electric Power Company , Chongqing 401123, China; 2. School of Electrical and Electronic Engineering , Huazhong University of Science and Technology , Wuhan 430074, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    逆变电源在故障时采取负序抑制控制策略及 低电压穿越控制策略,导致全比例新能源系统中储能场站侧正、负序电流分布系数严重不相等,引发相电流差突变量选相元件不正确选相。基于故障序分量网络,推导了相电流差突变量选相元件正确选相的限制条件,提出一种基于故障分量调控的相电流差突变量选相元件性能恢复方案。该方案能消除由于正、负序电流分布系数不相等而引发的储能侧选相性能下降的问题。仿真结果表明,所提方案恢复了传统电流突变量选相元件在全比例新能源系统中储能侧的性能,使现有电流突变量选相方案仍能适应高渗透率甚至全比例新能源电网。

    Abstract:

    The negative-sequence suppression control strategy and low-voltage ride-through control strategy are adopted when the inverter-based power supply fails,which leads to a serious inequality between the distribution coefficients of positive- and negative-sequence currents at the energy storage station side in a full-scale new energy system,resulting in incorrect phase selection of the phase current difference mutation element.Based on the fault sequence component network,the constraint condition for the correct phase selection of the phase current difference mutation element is derived.A phase selection performance recovery scheme based on fault component regulation is proposed,which can eliminate the degradation of phase selection performance at the energy storage side caused by unequal distribution coefficients of positive- and negative-sequence currents.Simulation results show that the proposed scheme restores the performance of the traditional current mutation phase selection element at the energy storage side in a full-scale new energy system,enabling existing current mutation phase selection schemes to remain applicable to high-penetration and even full-scale new energy grids.

    参考文献
    相似文献
    引证文献
引用本文

张林,王洪彬,陈迅,等.基于控保协同的适配全比例新能源电网突变量选相元件能力恢复策略[J].电力科学与技术学报,2026,41(1):53-62.
ZHANG Lin, WANG Hongbin, CHEN Xun, et al. Phase selection capacity recovery strategy for full -scale new energy grid based on coordinated control and protection[J]. Journal of Electric Power Science and Technology,2026,41(1):53-62.