治理农村光伏台区电压越限的模组化储能搬移方式及其充放电功率优化
CSTR:
作者:
作者单位:

(1.国网湖南省电力有限公司经济技术研究院 ,湖南 长沙 410029 ;2.能源互联网供需运营湖南省重点实验室 ,湖南 长沙 410029 ;3.长沙理工大学电气与信息工程学院 ,湖南 长沙 410114 ;4.长沙理工大学电网防灾减灾全国重点实验室 ,湖南 长沙 410114 )

作者简介:

通讯作者:

李宇(1998—),男,硕士研究生,主要从事电力新型储能方面的研究;E-mail:2877630621@qq.com

中图分类号:

TM73

基金项目:

国家电网公司总部科技项目(4000-202423083A-1-1-ZN)


Relocation and charging/discharging power optimization of modular energy storage for voltage limit violation mitigation in rural photovoltaic distribution station areas
Author:
Affiliation:

(1. State Grid Hunan Electric Power Company Limited Economic & Technical Research Institute , Changsha 410029 , China ; 2. Hunan Key Laboratory of Energy Internet Supply-Demand and Operation , Changsha 410029 , China ; 3. School of Electrical & Information Engineering , Changsha University of Science & Technology , Changsha 410114 , China ; 4. State Key Laboratory of Disaster Prevention and Reduction for Power Grid , Changsha University of Science & Technology , Changsha 410114 , China )

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对中国农村光伏台区季节性过 /低电压问题,提出适应中国农村光伏台区电压越限治理的模组化储能搬移方式及其充放电功率优化方法,将模组化储能搬移至光伏台区,调节储能的充放电有功功率和逆变器无功功率,实现电压越限治理。首先,分析中国农村光伏台区源荷特征,结合馈线电压平衡方程,揭示中国农村光伏台区电压越限的成因在于源荷的季节性不匹配。其次,利用模组化储能的可拆卸、灵活部署优势,提出模组化储能的数学模型。再次,以降低配电网节点电压偏差、网络损耗和弃光为前提,考虑模组化储能的搬移成本和租赁成本,构建模组化储能搬移和充放电功率控制的优化模型,优化决策储能搬移的节点和数量、有功和无功出力。最后,在中国湖南省衡东县配电系统中,验证所提方法的可行性和有效性。研究结果表明,模组化储能可以有效提升中国农村光伏台区的电压质量和经济效益。

    Abstract:

    To address the seasonal overvoltage and undervoltage issues in China ’s rural photovoltaic (PV) distribution station areas,this study proposes a relocation and charging/discharging power optimization method for modular energy storage adapted to the mitigation of voltage limit violations in the rural PV distribution station areas.Voltage limit violations are mitigated by relocating modular energy storage units to PV distribution station areas and regulating the active charging/discharging power of the energy storage units and the reactive power of the inverters.Specifically,the source-load characteristics of China's rural PV distribution station areas are analyzed.The feeder voltage equation is applied to reveal that the voltage limit violations in the rural distribution station areas are caused by the seasonal mismatch between sources and loads.Next,a mathematical model of modular energy storage is developed by leveraging its detachable and flexible deployment capabilities.Then,an optimization model for the relocation and charging/discharging power control of modular energy storage considering the relocation and leasing costs of modular energy storage is constructed on the premise of reducing node voltage deviations in the distribution network,network losses,and PV curtailment penalty.The model optimizes the candidate nodes for energy storage relocation,the number of relocated units,and their active and reactive power output.Finally,the feasibility and effectiveness of the proposed method are verified on the power distribution system in Hengdong County,Hunan Province.The results show that modular energy storage can effectively improve the voltage quality and economic benefits of China's rural PV distribution station areas.

    参考文献
    相似文献
    引证文献
引用本文

禹海峰,王翼飞,李宇,等.治理农村光伏台区电压越限的模组化储能搬移方式及其充放电功率优化[J].电力科学与技术学报,2026,41(4):256-266.
Yu Haifeng, Wang Yifei, Li Yu, et al. Relocation and charging/discharging power optimization of modular energy storage for voltage limit violation mitigation in rural photovoltaic distribution station areas[J]. Journal of Electric Power Science and Technology,2026,41(4):256-266.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2025-07-29
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2026-09-02
  • 出版日期:
文章二维码