    Abstract:

    The DC grounding system is one of important parts in DC transmission system. In order to ensure the reliable operation of DC transmission systems, it is necessary to develop live working tools for UHV grounding systems. In this paper, the overvoltage of grounding faults on BP and GR modes is calculated firstly and the maximum amplitude is 288 kV. Then, the switching impulse flashover tests are carried out in live working air gaps of a simulation tower. The routine method is employed and the live working safety distance is calculated as 0.65m. In addition, for the electric field strength at the surface of live working workers is generally less than 240 kV/m, the additional protection is not required for such electric field. Nevertheless, thermal insulation measures should be adopted due to the influence of hightemperature wire on the operating personnel and insulation tools. It is recommended to use the insulated rod operation method. Otherwise, necessary measures should be taken to ensure the safety distance when the direct work method is selected.

    Reference
    [1] 吴东,潘俊文,邹明,等.±800 kV特高压直流输电线路带电作业人体体表电场分布特性[J].电力科学与技术学报,2018,33(2):157164.WU Dong,PAN Junwen,ZOU Ming,et al.Research of electric field distribution characteristics for body surface of live working on ±800 kV[J].Journal of Electric Power Science and Technology,2018,33(2):157164.
    [2] 张亚迪,车彬,邱中华,等.基于人员体表场强的±800 kV特高压直流线路带电作业进入等电位的路径研究[J].高电压技术,2019,45(4):11311136.ZHANG Yadi,CHE Bing,QIU Zhonghua,et al.Research of entering path for live work on ±800 kV UHV DC transmission lines by body surface electri[J].High Voltage 2019,45(4):11311136.
    [3] 孟遂民,徐文洋.基于模糊层次分析法的特高压直流输电线路带电作业安全评价[J].高压电器,2016,52(11):4246.MENG Suimin,XU Wenyang.FAHPbased safety evaluation for liveline working on ultrahigh voltage DC transmission line[J].High Voltage Apparatus,2016,52(11):4246.
    [4] 李世龙,滕予非,李小鹏,等.基于注入法的改进特高压直流接地极引线保护方法[J].电力系统自动化,2019,43(16):155163+174.LI Shilong,TENG Yufei,LI Xiaopeng,et al.An improved protection method of grounding electrode line for UHVDC based on injection method[J].Automation of Electric Power Systems,2019,43(16):155163+174.
    [5] 许箴,秦勇明.35 kV线路带电作业安全距离计算与放电特性分析[J].电力科学与技术学报,2014,29(2):7175.XU Zhen,QIN Yongming.Discharge characteristics analysis and minimum approach distance calculation for live working on 35 kV line[J].Journal of electric power science and technology,2014,29(2):7175.
    [6] 王炳强,岳嵩,吴元香,等.高海拔地区220 kV输电线路带电作业安全距离技术研究[J].电力系统保护与控制,2017,45(24):158162.WANG Bingqiang,YUE Song,WU Yuanxiang,et al.Research on security distance of live working on 220 kV transmission line at high altitudes[J].Power System Protection and Control,2017,45(24):158162.
    [7] DL/T 876-2004,带电作业绝缘配合导则[S].
    [8] 李如虎.带电作业进入等电位方式点评[J].南方电网技术,2009,3(2):5961.LI Ruhu.Comments on the enter ways into equal potential in electrification operation[J].Southern Electric Power Technology,2009,3(2):5961.
    [9] 徐溧,郑克全,刘兰兰,等.配网不停电作业空调服研制[J].智慧电力,2017,45(9):98103.XU Li,ZHENG Kequan,LIU Lanlan,et al.Development of air conditiioning suit for distribution network working with power uninterrupted[J].Smart Power,2017,45(9):98103.
    Related
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation

崔建业,赵乐冰,陈智伟,程 磊,潜力群.±800kV直流接地极线路带电作业方式[J].电力科学与技术学报英文版,2020,35(1):176-180. CUI Jianye, ZHAO Lebing, CHEN Zhiwei, CHENG Lei, QIAN Liqun. Study on live working of ± 800 kV DC electrode line[J]. Journal of Electric Power Science and Technology,2020,35(1):176-180.

Copy
Share
Article Metrics
  • Abstract:417
  • PDF: 1085
  • HTML: 0
  • Cited by: 0
History
  • Online: August 20,2020
Article QR Code