Monthly purchasing decisions across provinces and regions considering multiple constraints and planmarket coordination
Author:
Affiliation:

Clc Number:

TM732

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With the gradual opening up of the power market, the injection of outside lowprice electricity brings great challenges to the power purchase decision of receiving object. On the background, this paper classifies and sorts out the purchasing cost of different purchasing channels in the electricity plan and market, and then analyzes a series of constraints which needs to be considered in the acrossprovinces /and acrossregions power purchasing. Thus, a monthly trading decisionmaking framework is put forward for the electricity plan and market coordination with the acrossprovinces /and acrossregions trading. In addition, for the purpose of minimizing the total power purchase cost, the power flow safety constraints, on the ultra high voltage direct current (UHVDC) tie line and interprovincial transmission channel constraint are considered. Finally, the Hunan power grid is taken as an example. The influence of crossprovince and crossregion power purchase constraints on the power purchase results is discussed to verify the effectiveness of the proposed model.

    Reference
    Related
    Cited by
Get Citation

李伏才,李湘旗,罗朝春,徐彬焜,张明敏,刘俊鹏,文明,谭玉东,刘晓丹.考虑多重约束和计划-市场协调的跨省跨区月度购电决策[J].电力科学与技术学报英文版,2021,36(1):206-215. LI Fucai, LI Xiangqi, LUO Zhaochun, XU Binkun, ZHANG Mingmin, LIU Junpeng, WEN Ming, TAN Yudong, LIU Xiaodan. Monthly purchasing decisions across provinces and regions considering multiple constraints and planmarket coordination[J]. Journal of Electric Power Science and Technology,2021,36(1):206-215.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: April 16,2021
  • Published: