Research on incremental distribution network cooperation model based on dynamic comprehensive fuzzy evaluation
CSTR:
Author:
Clc Number:

TM71

  • Article
  • | |
  • Metrics
  • |
  • Reference [18]
  • | | | |
  • Comments
    Abstract:

    Due to the multi-agent problem in the investment construction of a newly added distribution network and the unclear cooperation mode between the agents, the paper studies the cooperation mode between the incremental distribution network and the power supply company. Firstly, the paper constructs an evaluation index system based on saliency-redundancy analysis. Then, in order to ensure the weighting accuracy, an objective weighting method and a subjective method are utilized to construct an index weighting model based on the analytic hierarchy process method modified by the entropy weighting method. After that, on the basis of the changing speed state model and the changing speed trend prediction model, a dynamic dynamic-comprehensive fuzzy evaluation model for the Cooperation Mode of the incremental distribution network is constructed. Finally, four scenarios are set up:absolute control of power supply company, relative control of power supply company, the shareholding of power supply company, and non-shareholding of power supply company to perform example analysis. The calculation examples show that the dynamic-comprehensive evaluation model can reflect the actual level of effectiveness better than the static evaluation model.

    Reference
    [1] 董红,刘敦楠,马冠雄,等.电网企业参与竞争性业务的适应性策略及业务模式[J].电力大数据,2018,21(4):82-87.DONG Hong,LIU Dunnan,MA Guanxiong,et al.Adaptive strategy and business model for grid enterprises to participate in competitive business[J].Power Systems and Big Data,2018,21(4);82-87.
    [2] 杨楠,隆舰艇,黄悦华,等.考虑增量用电负荷分配的煤改电/煤改气联合分阶段规划[J].电力系统保护与控制,2020,48(17):55-67.YANG Nan,LONG Jianting,HUANG Yuehua,et al.Joint staged planning of coal-to-electricity/coal-to-gas consideringincremental electricity load distribution[J].Power System Protection and Control,2020,48(17):55-67.
    [3] 王淇,刘继春,杨阳方.考虑主动管理措施的增量配电网网架规划[J].电测与仪表,2019,56(22),37-43.WANG Qi,LIU Jichun,YANG Yangfang.Framework planning of incremental distribution network considering active management[J].Electrical Measurement & Instrumentation,2019,56(22),37-43.
    [4] 胡源,熊天军,薛松,等.增量配售电公司评价方法研究[J].智慧电力,2020,48(6):47-53.HU Yuan,XIONG Tianjun,XUE Song,et al.Comprehensive evaluation of incremental electricity distribution and retail company[J].Smart Power,2020,48(6):47-53.
    [5] 韩一鸣,靳盘龙,郭宁.基于停电损失评价的固原市配网投资效益研究[J].机电信息,2019,7(9):10-12.HAN Yiming,JIN Panlong,GUO Ning.Research on the investment benefit of Guyuan distribution network based on the evaluation of outage loss[J].Mechanical and Electrical Information,2019,7(9):10-12.
    [6] 周鹏程,吴南南,曾鸣.考虑投入产出关联关系的配网效益评价研究[J].山东电力技术,2017,44(12):1-5+11.ZHOU Pengcheng,WU Nannan,ZENG Ming.Study on the benefit evaluation of distribution network considering the relationship between input and output[J].Shandong Electric Power,2017,44(12):1-5+11.
    [7] 贾梦雨,李锰,韩松,等.基于博弈论组合赋权的农村电网综合评价体系研究[J].电力科学与技术学报,2020,35(2):69-75.JIA Meng Yu,LI Meng,HAN Song,et al.Research on comprehensive evaluation system of rural power grid based on game theory combination weighting[J].Journal of Electric Power Science and Technology,2020,35(2):69-75.
    [8] 杨波.10 kV及以下配网建设与改造投资后评价指标体系研究[J].南方电网技术,2009,3(S1):8-14.YANG Bo.Research on the evaluation index system of 10 kV and below distribution network construction and transformation investment[J].Southern Power System Technology,2009,3(S1):8-14.
    [9] Macedo M N Q,Galo J J M,Almeida A L,et al.Demand side management using artificial neutral networks in a smart grid environment[J].Renewable and Sustainable Energy Reviews,2015,6(41):128-133.
    [10] 郭艳飞,任雪桂,鞠力,等.基于层次分析法的综合能源系统能效评估方法研究及应用[J].电力科学与技术学报,2018,33(4):121-128.GUO YanFei,REN XueGui,JU Li,et al.Research and application of comprehensive energy system energy efficiency evaluation method based on AHP[J].Journal of Electric Power Science and Technology,2018,33(4):121-128.
    [11] 肖康,朱洁.配电网后评价助力配网建设精准投资[J].中国电力企业管理,2019,4(5):56-57.XIAO Kang,ZHU Jie.Post evaluation of distribution network helps precision investment in distribution network construction[J].China Power Enterprise Management,2019,4(5):56-57.
    [12] Hejazi H A,Araghi A R,Vahidi B,et al.Independent distributed generation planning to profit both utility and DG inventors[J].IEEE Transaction on Power Systems,2013,28(2):1170-1178.
    [13] 张辰,杨鸿珍,黄红兵,等.基于社团结构的电力通信网可靠性评估方法[J].电网与清洁能源,2019,35(10):17-22+27.ZHANG Chen,YANG Hongzhen,HUANG Hongbing,et al.Reliability evaluation method of power communication network based on community structure[J].Power System and Clean Energy,2019,35(10):17-22+27.
    [14] 张家安,安世兴,陈建,等.考虑分布式电源灵活接入下的配电网风险评估[J].供用电,2019,36(5):29-33.ZHANG Jiaan,AN Shixing,CHEN Jian,et al.Distribution network risk assessment considering the flexible access of DG[J].Distribution & Utilization,2019,36(5):29-33.
    [15] 曾瑛,朱文红,张乃夫,等.基于聚类可靠度的电力通信网可靠性评价方法[J].计算机应用,2014,34(S1):21-23+27.ZENG Ying,ZHU Wenhong,ZHANG Naifu,et al.Reliability evaluation method of power communication network based on clustering reliability[J].Journal of Computer Applications,2014,34(S1):21-23+27.
    [16] 王瑞峰,王庆荣.基于改进双层聚类多目标优化的配电网动态重构[J].电力系统保护与控制,2019,47(21):92-99.WANG Ruifeng,WANG Qingrong.Multi-objective optimization of dynamic reconfiguration of distribution network based on improved Bilayer clustering[J].Power System Protection and Control,2019,47(21):92-99.
    [17] 任鹏,李翀,陶鹏,等.基于加权熵TOPSIS法的电网节点脆弱度评估[J].电力科学与技术学报,2019,34(3):143-149.REN Peng,LI Chong,TAO Peng,et al.Grid node vulnerability assessment based on weighted entropy TOPSIS method[J].Journal of Electric Power Science and Technology,2019,34(3):143-149.
    [18] 谭忠富,蒲雷,吴静,等.基于负荷率差别定价的分时输配电价优化模型[J].系统工程理论与实践,2019,39(11):2945-2952.TAN Zhongfu,PU Lei,WU Jing,et al.Time-sharing transmission and distribution price optimization model based on load rate differential pricing[J].System Engineering Theory and Practice,2019,39(11):2945-2952.
    Related
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation

刘宣,谭彩霞,王绵斌,安磊,谭忠富.基于动态综合模糊评估的增量配网合作模式[J].电力科学与技术学报英文版,2021,36(5):87-96. Liu Xuan, Tan Caixia, Wang Mianbin, An Lei, Tan Zhongfu. Research on incremental distribution network cooperation model based on dynamic comprehensive fuzzy evaluation[J]. Journal of Electric Power Science and Technology,2021,36(5):87-96.

Copy
Share
Article Metrics
  • Abstract:219
  • PDF: 654
  • HTML: 0
  • Cited by: 0
History
  • Online: November 16,2021
Article QR Code