    Abstract:

    The modular multilevel converter (MMC) modification combined with the characteristics of DC circuit breakers is one of the economical and feasible solutions to realize the DC fault clearing. Under the background, this paper proposes a MMC modification program based on resistance energyconsuming branches. The scheme realizes the rapid transfer and attenuation of the fault current through the mutual cooperation between the MMC and the additional ports and the resistance energy consumption branch of the line and the shutoff isolation branch. In addition, this solution utilizes the current flowing through the switch module of line resistance energyconsuming branch to accurately determine the fault type, and proposes a restart recovery strategy for the faulty line. Finally, a bipolar direct current transmission (MMCHVDC) system is established in PSCAD to verify the effectiveness of the proposed scheme and the restart recovery strategy of faulty lines. The simulation results show that the proposed scheme has a short fault clearing time and a small fault peak value, and the fault line restart process is stable and reliable.

    Reference
    Related
    Cited by
Get Citation

张烜一,江修波,郑文迪,晁武杰,李超.基于电阻耗能支路的MMC-HVDC线路故障清除与重启恢复策略[J].电力科学与技术学报英文版,2021,36(6):67-76. ZHANG Xuanyi, JIANG Xiubo, ZHENG Wendi, CHAO Wujie, LI Chao. MMCHVDC line fault clearing and restart recovery strategy based on the resistance energyconsuming branch[J]. Journal of Electric Power Science and Technology,2021,36(6):67-76.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 05,2022
  • Published: