    The uncertainty of new energy power generation poses a great challenge to the transmission system. Since the transmission cable has a certain overload capacity, it can be overloaded for a short time under the premise that the temperature does not exceed the limit value. A method of making full use of the overload level of the cable is proposed to improve the transmission capacity of the cable to new energy power generation in a short time. This method firstly uses the finite element method to calculate the cable temperature field distribution, establishes the allowable overload running time of the line and analyzes its influencing factors. Then the improved BP neural network algorithm is introduced to predict the overload time in combination with the actual power generation output curve. The results show that the BP neural network model has high accuracy and can be applied to evaluate the cable limit transmission capacity and provide rapid support for dispatching decisions.

    Reference
    [1] 焦东东,陈洁,方圆,等.基于变分模态分解下利用混合储能平抑风电出力波动的控制策略[J].电测与仪表, 2021,58(5):14?19. JIAO Dongdong,CHEN Jie,FANG Yuan,et al.Control strategy of hybrid energy storage for suppressing fluctuation of wind power output based on variational mode decomposition[J].Electrical Measurement & Instrumentation,2021,58(5):14?19.
    [2] 周泽昕,王兴国,杜丁香,等.过负荷状态下保护与稳定控制协调策略[J].中国电机工程学报,2013,33(28):146?153. ZHOU Zexin,WANG Xingguo,DU Dingxiang,et al.A coordination strategy between relay protection and stability control under overload conditions[J].Proceedings of the CSEE,2013,33(28):146?153.
    [3] 马国栋.电线电缆载流量[M].北京:中国电力出版社,2013:39?40。 MA Guodong.Current carrying capacity of wires and cables[M].Beijing:China Electric Power Press,2013:39?40.
    [4] 陈玉,郝义,姚凯,等.500 kV充油海底电缆运行状态综合在线监测系统研究[J].电测与仪表,2021,58(10): 133?139. CHEN Yu,HAO Yi,YAO Kai,et al.Research on integrated on?line monitoring system for operating status of 500 kV oil?filled submarine cabl[J].Electrical Measurement & Instrumentation,2021,58(10):133?139.
    [5] HU J,XIONG X F,WANG J.Current tolerance capability calculation model of transmission lines and its application in overload protection[J].Electric Power Components and Systems,2018,46(14):1509?1521.
    [6] 李熙谋.电力电缆短时容许过载能力及其标准算法[J].电力设备,2001,2(3):59?60. LI Ximou.Power cable permissible short duration overload capacity and its standard algorithm[J].Electrical Equipment,2001,2(3):59?60.
    [7] 李瑞芳,胡豪,曹晓斌,等.单芯电缆耦合电路等效模型及无功损耗影响因素研究[J].高压电器,2021,57(7):119?126. LI Ruifang,HU Hao,CAO Xiaobin,et al.Study on equivalent model of coupled circuit of single?core cable and influencing factors of reactive power loss[J].High Voltage Apparatus,2021,57(7):119?126.
    [8] 柴鹏,周灏,张煜,等.基于双端行波法的电缆线路短路故障定位改进[J].中国电力,2020,53(11):168?174. CHAI Peng,ZHOU Hao,ZHANG Yu,et al.Short?circuit fault location for power cables based on improved two?terminal traveling wave method[J].Electric Power,2020,53(11):168?174.
    [9] 张群峰,庄小亮,牛海清,等.考虑XLPE过热性能的配电电缆过载流能力的提高[J].电气应用,2015(10):20?23. ZHANG Qunfeng,ZHUANG Xiaoliang,NIU Haiqing,et al.Improvement of emergency current?carrying capacity of distribution cables considering overheating performance of XLPE[J].Electrotechnical Application,2015(10):20?23.
    [10] 李文祥,刘刚,王振华,等.XLPE三芯电缆稳态并联热路模型及实验验证[J].南方电网技术,2015,9(3):57?62. LI Wenxiang,LIU Gang,WANG Zhenhua,et al.Steady?state parallel thermal circuit model for three?core XLPE cable and its experimental verification[J].Southern Power System Technology,2015,9(3):57?62.
    [11] 王雪菲,李京,陈平,等.基于行波波形综合相似度比较的电缆故障选线[J].电力系统保护与控制,2022,50(1):51?59. WANG Xuefei,LI Jing,CHEN Ping. Cable fault line selection based on comprehensive similarity comparison of traveling wave waveforms[J].Power System Protection and Control,2022,50(1):51?59.
    [12] 李嘉明,于沛鑫,邓军波,等.基于EMTP仿真平台的超高压电缆操作过电压特性及其影响研究[J].智慧电力,2021,49(10):83?89. LI Jiaming,YU Peixin,DENG Junbo,et al.Characteristics and influence of switching overvoltage in extra high voltage cables based on EMTP[J].Smart Power,2021,49(10):83?89.
    [13] 杨世铭,陶文铨.传热学[M].北京:高等教育出版社,2006:79?85. YANG Shiming,TAO Wenquan.Heat transfer[M].Beijing:Higher Education Press,2006:79?85.
    [14] IEC 60287—2001.calculation of the current rating?part 1:current rating equations (100% load factor) and calculation of losses[S].
    [15] 范京艺.考虑断面短时过载的断面输电能力提高的研究[D].北京:华北电力大学,2017. FAN Jingyi.Research on improvement of section transmission capacity considering section short time overload[D].Beijing:North China Electric Power University,2017.
    [16] 韩晓燕.热路模型在动态增容技术中的研究与应用[J].河南科技,2019(29):150?152. HAN Xiaoyan.Research and application of thermalpath model in dynamic capacity increasing technology[J].Henan Science and Technology,2019(29):150?152.
    [17] 曾召田,范理云,莫红艳,等.土壤热导率的影响因素实验研究[J].太阳能学报,2018,39(2):377?384. ZENG Zhaotian,FAN Liyun,MO Hongyan,et al.Experimental research on influencing factors of soil thermal conductivity[J].Acta Energiae Solaris Sinica,2018,39(2):377?384.
    [18] 余传辉.地下土壤导热系数计算方法及结果分析[D].长春:吉林大学,2004. YU Chuanhui.Calculation method and result analysis of thermal conductivity of underground soil[D].Changchun:Jilin University,2004.
    [19] 郭智刚,高健,闫峰,等.长距离330 kV电缆依频模型局放传输特性分析及信号定位试验验证[J].电网与清洁能源,2022,38(11):17?26. GUO Zhigang,GAO Jian,YAN Feng,et al.Partial discharge transmission characteristic analysis of the frequency?dependent model of the long distance 330 kV cable and experimental verification of signal positioning[J].Power System and Clean Energy,2022,38(11):17?26.
    [20] 吴龙.基于ANSYS异步电动机过载热保护的研究[D].兰州:兰州理工大学,2020. WU Long.Research on overload thermal protection of asynchronous motor based on ANSYS[D].Lanzhou:Lanzhou University of Technology,2020.
    [21] 齐琦,陈芳芳,赵辉,等.基于优化BP神经网络光伏出力短期预测研究[J].计算机测量与控制,2021,29(4):70?75. QI Qi,CHEN Fangfang,ZHAO Hui,et al.Prediction of photovoltaic output based on improved neural network[J].Measurement & Control Programming,2021,29(4):70?75.
    [21] 杨赛.BP神经网络学习问题的分析研究[D].赣州:江西理工大学,2019. YANG Sai.Analysis and research on bp neural network learning problems[D].Ganzhou:Jiangxi University of Science and Technology,2019.
    Related
    Cited by
Get Citation

魏文青,淡淑恒.基于有限元和神经网络的电缆输送新能源极限能力评估[J].电力科学与技术学报英文版,2023,38(1):191-200. WEI Wenqing, DAN Shuheng. Evaluation of ultimate capacity of cable transmission new energy based on finite element and neural network[J]. Journal of Electric Power Science and Technology,2023,38(1):191-200.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Online: April 10,2023
Article QR Code