WANG Chenyu
College of Electrical Engineering, Shanghai University of Electric Power, Shanghai 200090, ChinaTANG Zhong
College of Electrical Engineering, Shanghai University of Electric Power, Shanghai 200090, ChinaWEI Minjie
College of Electrical Engineering, Shanghai University of Electric Power, Shanghai 200090, ChinaLIU Xiangyang
College of Electrical Engineering, Shanghai University of Electric Power, Shanghai 200090, ChinaCUI Haoyang
College of Electronics and Information Engineering, Shanghai University of Electric Power, Shanghai 200090, China(1.College of Electrical Engineering, Shanghai University of Electric Power, Shanghai 200090, China; 2.College of Electronics and Information Engineering, Shanghai University of Electric Power, Shanghai 200090, China)
TM73
王宸宇,唐 忠,魏敏捷,刘向阳,崔昊杨.考虑源荷两侧不确定性的含风电‒垃圾焚烧热电联产虚拟电厂协调优化调度[J].电力科学与技术学报英文版,2024,39(6):232-241. WANG Chenyu, TANG Zhong, WEI Minjie, LIU Xiangyang, CUI Haoyang. Coordinated and optimized scheduling of virtual power plants with wind power‑waste incineration cogeneration considering uncertainty of source and load sides[J]. Journal of Electric Power Science and Technology,2024,39(6):232-241.
Copy