考虑分布式电源及需求响应不确定性的园区综合能源系统经济调度
作者:
作者单位:

作者简介:

通讯作者:

潘华(1976-),男,硕士,副教授,主要从事电力安全信息化与决策的研究;E-mail:stevepan2005@126.com

中图分类号:

TM731

基金项目:

国家自然科学基金(51707112);国家社会科学基金(19BGL003);上海市哲社基金(2019BGL002)


Economic dispatch of park integrated energy system considering the uncertainty of distribution generation and demand response
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    需求响应(DR)在协助园区综合能源系统(PIES)消纳分布式电源(DG)上发挥了重要的作用,然而其不确定性却又给PIES经济运行带来了巨大的挑战。鉴于此,提出一种基于信息间隙决策理论(IGDT)的PIES经济调度模型。首先,以系统运行成本最小为目标,构建含DR的冷/热/电联供型PIES经济调度模型。在此基础上,利用IGDT处理DR和DG的不确定性,针对传统IGDT仅适用于单因素偏差系数的问题,赋予DR和DG出力偏差系数不同的权重,兼顾二者的不确定性对PIES经济运行所带来的影响;针对不同类型的决策者分别建立风险规避鲁棒模型和风险偏好机会模型,满足不同类型决策的需要。然后,通过GAMS软件求解,量化分析PIES在不同目标运行成本下,2种不同决策模型所对应的不确定性的等效偏差系数。最后,通过算例验证所提模型的有效性,为PIES调度计划者制定调度计划提供定量的决策依据。

    Abstract:

    Demand response (DR) has played an important role in promoting the integration distribution generations (DG) into the park integrated energy system (PIES). However, the uncertainty of DGs becomes a huge challenge to the economic operation of PIES.In view of this, a PIES economic dispatch model is proposed on the basis of the information gap decision theory (IGDT).First of all, with the objective function of minimizing the operating cost of the PIES, an economic dispatch model of PIES with DR is constructed with the consideration of cooling/heating/electricity.On this basis, the IGDT is utilized to deal with the uncertainties of DR and DG. Since the traditional IGDT is only suitable for single-factor deviation coefficients, different weights are set to DR and DG to take all the uncertainties into account when analyzing the impact of economic operations of PIES.For different types of decision makers, a risk aversion robustness model and a risk seeker opportuneness model were established to meet the needs of different types of decision-making. Then, according to the GAMS software, the equivalent deviation coefficients are calculated for the uncertainties corresponding to the two different decision-making models, with the consideration of different operating cost targets. Finally, the validity of the proposed model is verified by a case study, which provides a quantitative decision-making basis for the planner to make PIES scheduling plans.

    参考文献
    相似文献
    引证文献
引用本文

潘华,姚正,黄玲玲,等.考虑分布式电源及需求响应不确定性的园区综合能源系统经济调度[J].电力科学与技术学报,2022,37(2):94-105.
PAN Hua, YAO Zheng, HUANG Lingling, et al. Economic dispatch of park integrated energy system considering the uncertainty of distribution generation and demand response[J]. Journal of Electric Power Science and Technology,2022,37(2):94-105.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2022-05-26
  • 出版日期: